首页> 外文期刊>Construction manager >It's normal to work harder to win work...
【24h】

It's normal to work harder to win work...

机译:努力工作来赢得工作是正常的。

获取原文
获取原文并翻译 | 示例
           

摘要

Tendering - and finding projects to tender for - is typically taking up far more management time than previously. "It takes a lot more management time in terms of finding out what's available and getting on the lists," says Steve Burditt, managing director of contractor Steele & Bray in Northampton. "We're probably working harder and doing less."Hampshire-based Wilding & Butler says its strike rate has dropped. "Previously, we'd expect to win one in three jobs, or one in four - now it's more like one in eight. We're having to look at every possible avenue when pricing a tender, finding the key to carrying out a job. We're being a lot smarter when it comes to tendering. At this level, one wrong move and you've racked up a loss," says director Phil Wilding.
机译:招标(以及寻找要投标的项目)通常比以前占用更多的管理时间。 “在找到可用的东西并进入清单上需要花费大量的管理时间,”北安普顿承包商Steele&Bray的董事总经理Steve Burditt说。位于汉普郡的Wilding&Butler说:“我们可能会更加努力,减少工作。”罢工率下降了。 “以前,我们希望赢得三分之一的工作,或者四分之一的工作,现在更像是八分之一。我们必须在定价时考虑每一个可能的途径,找到开展工作的关键“在招标方面,我们变得更加聪明。在这个水平上,一个错误的举动使您蒙受了损失,”董事Phil Wilding说。

著录项

  • 来源
    《Construction manager》 |2012年第3期|p.17|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号