首页> 外文期刊>Construction Management and Economics >Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China
【24h】

Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China

机译:确定影响灾后重建资源可用性的因素:以中国为例

获取原文
获取原文并翻译 | 示例
           

摘要

The availability of resources allows for the rapid and cost-effective delivery of a construction project. For rebuilding programmes after a disaster, the need for better understanding of factors affecting resource availability and their potential impacts on resourcing outcomes can be of crucial importance to effective reconstruction performance. Drawing on an empirical survey in China following the 2008 Wenchuan earthquake, the critical factors affecting resource availability for post-quake reconstruction of housing are identified. Resource availability in a post-disaster situation is not only associated with (1) project-related factors such as quantity of resources required, project schedule, project resourcing plan, and resource procurement lead time; and (2) factors related to the reconstruction practitioners, including competency of resourcing manager and qualification of contractor; but is also related to (3) factors external to reconstruction projects including legislation and policy, general economic environment, and resource transportation cost and method. To address these factors, a multi-sector approach is needed for reconstruction decision makers and practitioners. A planned procurement strategy in the implementing contractors, a range of training initiatives for small and medium businesses, along with augmented regulatory, economic and transport infrastructure systems are likely to improve resource availability for post-disaster rebuilding projects.
机译:资源的可用性允许快速,经济地交付建设项目。对于灾难后的重建计划,需要更好地了解影响资源可用性的因素及其对资源筹集成果的潜在影响,对于有效的重建绩效至关重要。根据2008年汶川地震后在中国进行的一项实证调查,确定了影响房屋地震灾后重建资源的关键因素。灾后资源的可用性不仅与(1)与项目相关的因素有关,例如所需的资源数量,项目进度,项目资源计划以及资源采购提前期; (2)与重建从业人员有关的因素,包括资源经理的能力和承包商的资格;但也与(3)重建项目外部的因素有关,包括立法和政策,总体经济环境以及资源运输成本和方法。为了解决这些因素,重建决策者和从业人员需要采取多部门方法。实施承包商中的计划采购策略,针对中小型企业的一系列培训计划以及增强的监管,经济和运输基础设施系统,可能会改善灾后重建项目的资源可用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号