首页> 外文期刊>Construction and Building Materials >Analysis of chloride diffusion in concrete structures for prediction of initiation time of corrosion using a new meshless approach
【24h】

Analysis of chloride diffusion in concrete structures for prediction of initiation time of corrosion using a new meshless approach

机译:使用新的无网格方法分析混凝土结构中的氯离子扩散,以预测腐蚀的发生时间

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, a finite point method (FPM) is developed and adopted for solving the chloride diffusion equation for prediction of service life of concrete structures and initiation time of corrosion of reinforcements. Diffusion of chloride ions is generally assumed to follow the Fick's second law. FPM is a truly meshless method which uses a moving least square approximation within a collocation strong form for solving the governing differential equation. Several 1D and 2D problems are solved using FPM and the results are compared with the analytical solution, classical finite element and finite difference methods, and weak form meshless based element free Galerkin method.
机译:本文提出了一种有限点法(FPM),用于求解氯离子扩散方程,以预测混凝土结构的使用寿命和钢筋腐蚀的开始时间。通常假定氯离子的扩散遵循菲克第二定律。 FPM是一种真正的无网格方法,它在搭配强形式内使用移动最小二乘近似来求解控制微分方程。使用FPM解决了一些一维和二维问题,并将结果与​​解析解,经典有限元和有限差分法以及基于无格式无网格的无网格Galerkin方法进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号