首页> 外文期刊>Concurrent engineering >The Minimum-cost PD Process Planning and Control Methodology with the Consideration of Resource/Time Constraints and Skill Levels
【24h】

The Minimum-cost PD Process Planning and Control Methodology with the Consideration of Resource/Time Constraints and Skill Levels

机译:考虑资源/时间约束和技能水平的最低成本PD过程规划和控制方法

获取原文
获取原文并翻译 | 示例

摘要

This research applies the benchmarking-based concept to propose a minimum-cost product development (PD) process planning and control methodology to consider resource/time constraints and skill levels. The methodology can aid PD project managers to more objectively perceive the relationship among activity times, activity costs, as well as quantities of different skill-level manpower and facilities. Hence, the minimum-cost PD process management approach proposed in this paper can assist project managers to optimize R&D resource allocation of a PD process and estimate activity times and activity costs. In addition, this paper provides the minimum-cost PD process planning and control mechanisms to dynamically modify the PD project process.
机译:这项研究运用基于基准的概念来提出一种最低成本的产品开发(PD)过程规划和控制方法,以考虑资源/时间限制和技能水平。该方法可以帮助PD项目经理更客观地了解活动时间,活动成本以及不同技能水平的人力和设施之间的关系。因此,本文提出的最低成本的PD流程管理方法可以帮助项目经理优化PD流程的R&D资源分配,并估算活动时间和活动成本。此外,本文提供了用于动态修改PD项目过程的最低成本的PD过​​程计划和控制机制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号