首页> 外文期刊>Concurrency, practice and experience >Amodified hybridwhale optimization algorithm for the scheduling problem inmultimedia data objects
【24h】

Amodified hybridwhale optimization algorithm for the scheduling problem inmultimedia data objects

机译:多媒体数据对象调度问题的改进混合鲸鱼优化算法

获取原文
获取原文并翻译 | 示例

摘要

The scheduling of the Multimedia Data Objects (MDO) is a difficult and extraordinary issue that faces us in the World Wide Web (WWW) to minimize the response time for clients to finish rapidly their tasks. MDO scheduling problem can be modeled as a Two-Machine Flow Shop Scheduling Problem (T-MFSSP) that minimizes the makespan. Notwithstanding another objective is to decrease the average lateness time of the clients' jobs. This paper proposes a Modified Hybrid Whale Algorithm (MHWA) to solve a standout among the most imperative applications of flow shop scheduling in the field of MDO. MHWA is hybridized with a local search strategy for solving the scheduling problem of MDO. To cope up with the combinatorial nature of the MDO scheduling, LRV maps the continuous search space into a sequence of jobs. To get better solutions, some operations are applied to the solutions such as swap mutation and reversed block insertion operations. Nawaz-Enscore-Ham (NEH) is added to MHWA to upgrade the performance of the algorithm. The solution of Johnson heuristic is added to the initial population of MHWA. It can be inferred that MHWA gives competitive outcomes appeared differently in relation to Johnson and Earliest Due Date (EDD) algorithms. MHWA can obtain the optimal makespan and can minimize the average lateness of the jobs.
机译:多媒体数据对象(MDO)的调度是一个棘手且非同寻常的问题,在万维网(WWW)中我们面临着这样的问题,即如何最大限度地减少客户端快速完成任务的响应时间。 MDO调度问题可以模型化为两机流水车间调度问题(T-MFSSP),以最大程度地减少工期。尽管还有一个目标是减少客户工作的平均延迟时间。本文提出了一种改进的混合鲸鱼算法(MHWA),以解决流水车间调度在MDO领域最重要的应用中的突出问题。 MHWA与本地搜索策略混合,用于解决MDO的调度问题。为了应付MDO调度的组合性质,LRV将连续搜索空间映射到一系列作业中。为了获得更好的解决方案,一些操作应用于解决方案,例如交换突变和反向块插入操作。 MHWA中添加了Nawaz-Enscore-Ham(NEH),以升级算法的性能。 Johnson启发式解决方案已添加到MHWA的初始人口中。可以推断,MHWA给出的竞争结果与Johnson和最早到期日期(EDD)算法相比有所不同。 MHWA可以获得最佳的有效期,并且可以使作业的平均延迟最小化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号