首页> 外文期刊>Concurrency, practice and experience >Research in the calculation of the debris flow prevention and Geographic Information System control engineering
【24h】

Research in the calculation of the debris flow prevention and Geographic Information System control engineering

机译:泥石流防治与地理信息系统控制工程的计算研究

获取原文
获取原文并翻译 | 示例
       

摘要

Currently, it is very hard and low effective to collect watershed characteristic data when calculatingrndebris flow to prevent and control it. This article identifies that the optimum resolution in thernstudy area is 10 m in digital elevation model. And on the base of this, using the MATLAB digitalrnsoftware has implemented the relatively new “three‐direction algorithm” to fill the bottom landrnand has extinguished the phenomenon of river “parallel” in the traditional calculation. It is goodrnat keeping the original terrain information and successfully builds up the hydrologically correctrndigital elevation model. Extracting the water network and related watershed parameters, afterrnorganic combination treatment, and combining with the feature of debris flow in the study area,rna point of prevention and control project is set up at the upstream of Subao River. Using GeographicrnInformation System technology, we have achieved to extracting the data of the debrisrnflow valley area F, main gully length L, and the main gully bed average longitudinal shrinking slopernJ, automatically, rapidly, and accurately. In the MATLAB platform, we design an automatic algorithmrnto calculate the flood peak flow and debris flow peak flow in rainstorm. Combining withrnthe practical situation of the study area, it can finally calculate the debris flow.
机译:当前,在计算泥石流以防止和控制时,收集流域特征数据非常困难且效率很低。本文确定在数字高程模型中研究区域的最佳分辨率为10 m。在此基础上,使用MATLAB数字软件实现了较新的“三向算法”来填满底部土地,并消除了传统计算中河流“平行”的现象。最好保留原始地形信息,并成功建立水文校正数字高程模型。提取水网及相关流域参数,进行有机后处理,并结合研究区泥石流的特点,在Subao河上游建立了防治点。利用地理信息系统技术,我们实现了自动,快速,准确地提取泥石流谷地面积F,主沟长L和主沟床平均纵向收缩斜率J的数据。在MATLAB平台上,我们设计了一种自动算法来计算暴雨中的洪峰流量和泥石流峰值流量。结合研究区的实际情况,可以算出泥石流。

著录项

  • 来源
    《Concurrency, practice and experience》 |2017年第24期|e4237.1-e4237.10|共10页
  • 作者单位

    School of Geoscience and Technology,Southwest Petroleum University, Chengdu610500, China State Key Laboratory of Oil and GasReservoir Geology and Exploitation,Southwest Petroleum University, Chengdu610500, China;

    School of Geoscience and Technology,Southwest Petroleum University, Chengdu610500, China State Key Laboratory of Oil and GasReservoir Geology and Exploitation,Southwest Petroleum University, Chengdu610500, China;

    Hefei Surveying and mapping Institute, Heifei230001, China;

    School of Geoscience and Technology,Southwest Petroleum University, Chengdu610500, China State Key Laboratory of Oil and GasReservoir Geology and Exploitation,Southwest Petroleum University, Chengdu610500, China;

    School of Geoscience and Technology,Southwest Petroleum University, Chengdu610500, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    debris flow calculation; extract automatically; GIS; watershed parameters;

    机译:泥石流计算;自动提取;地理信息系统分水岭参数;
  • 入库时间 2022-08-18 02:16:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号