...
首页> 外文期刊>Concrete >Singapore bridge demolition by heavy lifting equipment
【24h】

Singapore bridge demolition by heavy lifting equipment

机译:新加坡桥梁用重型起重设备拆除

获取原文
获取原文并翻译 | 示例
           

摘要

During the past few years, traf-fic loadings have increased steadily and the structural specification for bridges has changed. Many bridges built in the 1970s and 1980s now need strengthening or replacing. Assuming their foundations are adequate, simply supported and continuous structures can be strengthened by external prestress-ing. However, some structures may not be suitable for strengthening, because of inadequate foundations orrnunsuitable superstructures, such as concrete frames. In the following example, the existing flyover had to be demolished and a sophisticated system was developed to do this without using scaffolding or diverting roads.
机译:在过去的几年中,交通荷载稳定增长,桥梁的结构规格也发生了变化。现在,需要对1970年代和1980年代建造的许多桥梁进行加固或更换。假设它们的基础足够,可以通过外部预应力来简单地支撑和连续结构。但是,由于基础不足或不合适的上部结构(例如混凝土框架),某些结构可能不适合加固。在下面的示例中,必须拆除现有的立交桥,并开发出一种先进的系统来做到这一点,而无需使用脚手架或改道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号