首页> 外文期刊>Concrete >ICE Specification for Piling and Embedded Retaining Walls
【24h】

ICE Specification for Piling and Embedded Retaining Walls

机译:ICE桩和嵌入式挡土墙规范

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This is the long-standing guide to the specification of piling and embedded walling works, now in its third edition and first published 28 years ago as the ICE Specification for Piling. Most of the piling and embedded wall contracts in the UK use this specification, which is now adopted by Highways England and Network Rail. It reflects the latest piling techniques and procurement methods, incorporating revisions and new sections, in addition to revisions to British Standards, Eurocodes and CIRIA guides. The three-part style of the second edition has been retained, with a short Part A which outlines general requirements needed to procure a piling or retaining wall contract. Parts B and C cover specification requirements and guidance notes for different categories of piles and embedded walls, from driven precast concrete piles to steel sheet piles, and provide general requirements for concrete, mortar, structural grout and steel reinforcement. Testing, instrumentation, casings/coatings and support fluids are also discussed. Two appendices give examples of a project specification and a bill of quantities.
机译:这是有关打桩和嵌入式墙体工程规范的长期指南,目前为第三版,并于28年前作为ICE的打桩规范首次发布。英国的大多数打桩和嵌入式墙面合同均使用此规范,该规范现已由英国高速公路协会和Network Rail采纳。它反映了最新的打桩技术和采购方法,除了对英国标准,欧洲法规和CIRIA指南进行修订之外,还包含修订和新章节。第二版的三部分样式已保留,其中简短的A部分概述了采购打桩或挡土墙合同所需的一般要求。 B和C部分涵盖了从打入式预制混凝土桩到钢板桩的不同类别的桩和嵌入式墙的规范要求和指导说明,并提供了对混凝土,砂浆,结构灌浆和钢筋的一般要求。还讨论了测试,仪器,套管/涂料和支撑液。两个附录给出了项目规格和工程清单的示例。

著录项

  • 来源
    《Concrete》 |2017年第7期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号