...
【24h】

New Orleans' work starts

机译:新奥尔良的工作开始

获取原文
获取原文并翻译 | 示例
           

摘要

With the opening of the new Napoleon Intermodal Rail Yard, enabling on-dock ship-to-rail transfers, the US Gulf Port of New Orleans (LA) has set in motion its short- and long-term USD1 billion growth plan. The goal of the port author-ity's '2020 Master Plan', announced in March 2008, is to capture new container and breakbulk cargo at New Orleans. The port's container throughput increased by 43% between 2006 and 2007, reaching 315.375TEU, and the design capacity of its current container facilities is 366,000TEU annually. Short-term projects also include the addition of a third and fourth berth, raising capacity of the facility by almost 200,000TEU by 2012.
机译:随着新的拿破仑联运铁路场的启用,实现了船上到船上的中转,美国新奥尔良海湾港(LA)已启动了其短期和长期10亿美元的增长计划。港口当局于2008年3月宣布的“ 2020年总体规划”的目标是在新奥尔良捕获新的集装箱和散杂货。从2006年到2007年,该港口的集装箱吞吐量增长了43%,达到315.375TEU,其现有集装箱设施的设计能力为每年366,000TEU。短期项目还包括增加第三个和第四个泊位,到2012年将设施的产能提高近200,000TEU。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号