...
首页> 外文期刊>Containerisation international >Penang's NBCT phase III to start in summer
【24h】

Penang's NBCT phase III to start in summer

机译:槟城的NBCT第三阶段将于夏季开始

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The construction work of the Phase III extension project at Penang's North Butterworth Container Terminal (NBCT) is scheduled to commence in three months' time, with a view to complete by 2010. Mahamed Naina Merican, coo of the Port of Penang, told CI: 'The Malaysian Government has invested in dredging, and the port will invest in both infrastructure and superstructure. 'On completion of this expansion project, the total annualised capacity of the port will increase from the present 1.2 million TEU to 1.8 million TEU.'
机译:槟城北巴特沃斯集装箱码头(NBCT)的三期扩建项目的建设工作计划在三个月的时间内开始,以期在2010年之前完成。槟城港口首席运营官Mahamed Naina Merican告诉CI: ``马来西亚政府已投资挖泥,港口将投资基础设施和上层建筑。 “在这个扩建项目完成后,该港口的总年产能将从目前的120万标准箱增加到180万标准箱。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号