...
首页> 外文期刊>Containerisation international >Schedule reliability improved
【24h】

Schedule reliability improved

机译:进度可靠性得到改善

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Ocean carriers' schedule reliability improved significantly in Q2 09.rnAccording to Drewry Shipping Consultant's latest Container Shipper Insight report, 69% of all the vessels monitored in the period arrived on schedule or the day before.rnThis compares with just 60% in Q1 09. Moreover,rnthe average deviation time of 0.8 days was the first below one day. Drilling down into the data in more detail, the improvement from Asia to Europe in isolation climbed from 68% to 73%, with an average deviation time of just 0.6 days. In the transpacific, the change was from 54% to 65%, with an average deviation time of 0.6 days.
机译:根据Drewry Shipping Consultant的最新《 Container Shipper Insight》报告,海洋承运人的船期可靠性显着提高.rn根据09年第一季度的60%,德鲁里航运顾问公司最新的《集装箱托运人见解》报告显示,在此期间监测的所有船舶中有69%到达了船期。而且,平均偏差时间为0.8天是低于一天的第一个。更深入地分析数据,从亚洲到欧洲的改进幅度从68%上升到73%,平均偏差时间仅为0.6天。在跨太平洋地区,变化从54%到65%,平均偏离时间为0.6天。

著录项

  • 来源
    《Containerisation international》 |2009年第9期|18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号