...
首页> 外文期刊>Containerisation international >MSC Flaminia in Constantza, finally
【24h】

MSC Flaminia in Constantza, finally

机译:终于在康斯坦察的MSC Flaminia

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Fire-damaged boxship MSC Flaminia was finally granted entry into the Romanian port of Constantza for repair on May 17, having spent six weeks at anchor while the authorities inspected it and took samples to ensure no hazards remained. The 6,750 teu vessel arrived outside the port on March 29, having made an assisted passage from its JadeWeserPort refuge, en route to the Daewoo Mangalia Heavy Industries shipyard, where it is due to have its fire-ravaged mid-section replaced.
机译:失火的集装箱船MSC Flaminia最终于5月17日获准进入罗马尼亚康斯坦察港口进行修理,在当局进行检查并取样以确保没有危险的情况下,在船锚上呆了六个星期。这艘6,750 teu的船舶于3月29日抵达JadeWeserPort避难所的辅助通道,前往大宇曼加利亚重工业造船厂,该船将因火警中部而被更换。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号