...
【24h】

Taw Bridge

机译:两桥

获取原文
获取原文并翻译 | 示例
           

摘要

When faced with construction challenges on the new Taw Bridge, located on the £27.9m Barnstaple Western Bypass, design-and-build contractor, Nuttall, and its structural engineer, Halcrow, had little hesitation in choosing the balanced cantilever option. Using the balanced cantilever technique to construct multi-span, post-tensioned concrete box girder bridges is a tried and tested option resulting in a reduced requirement for falsework. Either the precast or the in-situ concrete alternative can be selected, depending on site circumstances, and progress can be rapid.
机译:面对位于2790万英镑的Barnstaple Western绕道上的新Taw桥的施工挑战时,设计建造承包商Nuttall及其结构工程师Halcrow毫不犹豫地选择了平衡悬臂选项。使用平衡悬臂技术来建造多跨度,后张预应力的混凝土箱梁桥是一种经过实践检验的选择,从而减少了对虚假工作的需求。可以根据现场情况选择预制或现场替代混凝土,并且进展很快。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号