首页> 外文期刊>Concrete Engineering >Research on widening of Harbin Songhuajiang Highway Bridge
【24h】

Research on widening of Harbin Songhuajiang Highway Bridge

机译:哈尔滨松花江公路大桥拓宽研究

获取原文
获取原文并翻译 | 示例
           

摘要

Harbin Songhuajiang Highway Bridge was completed in August 1986. Since then, it has provided improved communication between the town and country and has accelerated economic development. The bridge is made up of the nine-span main bridge (59m + 7 × 90m + 59m = 748m, continuous) and the 15-span approach bridge (15 × 30m = 450m, simple supported). The width of the deck is 24m, consisting of a 19m carriageway and two 2.5m walkways. An elevation of the main bridge and the bridge approach is shown in Figure 1.
机译:哈尔滨松花江公路大桥于1986年8月建成。此后,它改善了城乡之间的联系,加快了经济发展。该桥由九跨主桥(59m + 7×90m + 59m = 748m,连续)和十五跨引桥(15×30m = 450m,简单支撑)组成。甲板的宽度为24m,包括一条19m的行车道和两个2.5m的人行道。主桥和桥进场的立面如图1所示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号