Crane-free Operations Facilitate Working Processes - Opernturm, Frankfurt, Germany

机译:免起重机操作简化了工作流程-Opernturm,法兰克福,德国

获取原文
获取原文并翻译 | 示例
           

摘要

Fifty-two thousand square metres of office space are spread over 43 floors with an additional 10,000m~2 in the adjacent seven-storey podium building. The development of this inner-city, large-scale construction site is associated with enormously high safety requirements and presents a logistical challenge to all those involved in the project. Furthermore, due to the minimal storage and assembly areas available, the type and quantity of the form-work deliveries have to be adapted to match the planned construction sequence.
机译:52,000平方米的办公空间分布在43层,相邻的七层裙楼中还有10,000m〜2。这个城市内大型建筑工地的开发与极高的安全要求相关联,并且对所有参与该项目的人员提出了后勤挑战。此外,由于可用的最小存储和组装区域,必须调整模板交付的类型和数量,以匹配计划的施工顺序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号