首页> 外文期刊>Computing Canada >Bruce Power throws energy into capacity problem
【24h】

Bruce Power throws energy into capacity problem

机译:布鲁斯动力将能量投入容量问题

获取原文
获取原文并翻译 | 示例
           

摘要

Ontario's largest independent electricity generator has overcome an IT hurdle that will allow it move to ahead on a major storage management project. Bruce Power, which in 2001 formed an agreement with Ontario Power Generation to lease two nuclear generating stations for the next 18 years, has already completed an installation of Veritas's Net-Backup DataCcnter and Volume Manager to help deal with the expected growth of its data as a private company. It is now preparing to install a Veritas Cluster Server to eliminate planned downtime and SAN-Point control to simplify management of its storage area network (SAN).
机译:安大略省最大的独立发电机克服了IT障碍,将使其在大型存储管理项目上取得领先。布鲁斯电力公司(Bruce Power)于2001年与安大略省电力公司(Ontario Power Generation)达成协议,在未来18年内租赁两个核电站。该公司已经完成了Veritas的Net-Backup DataCcnter和Volume Manager的安装,以帮助应对其数据的预期增长。一家私人公司。现在,它正在准备安装Veritas Cluster Server,以消除计划内的停机时间和SAN-Point控制,以简化对其存储区域网络(SAN)的管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号