首页> 外文期刊>Computing Canada >Blackout shines light on need for business continuity plan
【24h】

Blackout shines light on need for business continuity plan

机译:停电使企业需要制定业务连续性计划

获取原文
获取原文并翻译 | 示例
           

摘要

It wasn't until the lights went out in August of 2003 that many companies were able to see the folly of their non-existent, inadequate or long-shelved and forgotten business continuity and disaster recovery plan. When the blackout hit on Aug. 14, 50 million Canadians and Americans were left without electricity. Canadian businesses lost some 18.9 million work hours and the country's gross domestic product took a 0.7 per cent hit, according to a report by the U.S.Canada Power System Outage Task Force. This is not surprising, considering a recent survey of business decision makers across Ontario found that 28 per cent of organizations do not have any business continuity plan. The survey was conducted by Leger Marketing on behalf of Fusepoint and Agility Recovery Solutions.
机译:直到2003年8月灯火通明后,许多公司才能够看到自己不存在,不足或长期搁置,被遗忘的业务连续性和灾难恢复计划的愚蠢之处。 8月14日大停电发生时,有五千万加拿大人和美国人没有电。根据美国加拿大电力系统中断工作组的报告,加拿大企业损失了大约1,890万工作小时,该国的国内生产总值遭受了0.7%的打击。考虑到最近对安大略省商业决策者的一项调查发现,有28%的组织没有任何业务连续性计划,这不足为奇。该调查由Leger Marketing代表Fusepoint和Agility Recovery Solutions进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号