首页> 外文期刊>Computers & Structures >Wind-induced load capacity analysis and parametric study of a long-span steel arch bridge under construction
【24h】

Wind-induced load capacity analysis and parametric study of a long-span steel arch bridge under construction

机译:大跨度钢拱桥在建风荷载能力分析及参数研究

获取原文
获取原文并翻译 | 示例
           

摘要

Wind-induced instability of long-span steel arch bridges is a serious engineering concern, particularly during construction. Using the Lupu Bridge with a main span length of 550-m as an example, this paper investigates the wind-induced load capacity of a long-span steel arch bridge during two construction stages Ⅰ and Ⅱ. Construction stage Ⅰ is a maximum-cantilevered system before closure of main arch ribs. Construction stage Ⅱ is a system in which all parts of the bridge have been completed except the stiffening girder of the main span. Three components of wind loads acting on both steel girder and arch ribs are considered in the analysis. The results show that the arch bridge at construction stage Ⅱ is more susceptible to wind-induced instability than at construction stage Ⅰ. Finally, various significant parameters affecting wind-induced load capacity are discussed.
机译:大跨度钢拱桥的风引起的不稳定性是一个严重的工程问题,特别是在施工期间。以主跨长度为550m的卢浦大桥为例,研究了大跨度钢拱桥Ⅰ和Ⅱ两个施工阶段的风荷载能力。施工阶段Ⅰ是主拱肋关闭前的最大悬臂系统。施工阶段Ⅱ是一个系统,其中除了主跨的加劲梁外,桥梁的所有部分都已完成。分析中考虑了作用在钢梁和拱肋上的风荷载的三个分量。结果表明,施工阶段Ⅱ的拱桥比施工阶段Ⅰ更易受到风致失稳的影响。最后,讨论了影响风荷载能力的各种重要参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号