...
机译:斜拉桥张紧过程的直接模拟
Department of Civil Engineering, University of Castilla-La Mancha, 13071 Ciudad Real, Spain;
Department of Bridge Engineering, Tongji University, 1239, Siping Road, 200092 Shanghai, China;
Instituto de Ciencia y Tecnologia del Hormigon (ICITECH), Departamento de Ingenieria de la Construction y Proyectos de Ingenieria Civil, Universitat Politecnica de Valencia, 46023 Valencia, Spain;
Department of Construction Engineering, Universitat Politicnica de Catalunya BarcelonaTech, 08034 Barcelona, Spain;
Construction simulation; Cable-stayed bridges; Temporary supports; Tensioning process; Analysis; Unstressed length;
机译:钢管座桥梁系统变换过程的替代辅助两相张力策略优化
机译:非对称斜拉桥张拉策略的优化及其对施工过程的影响
机译:非对称斜拉桥张拉策略的优化及其对施工过程的影响
机译:三好拱拱斜拉桥张拉过程
机译:斜拉桥中基于振动的电缆张力估计
机译:昆虫间接飞行肌肉中被动张力与强结合和弱结合桥之间的相互作用。通过凝溶胶蛋白介导的细丝去除功能解剖
机译:基于施工斜拉桥振动法评价电缆张力
机译:预应力后张混凝土节段箱梁斜拉桥结构计算机分析与设计。第2卷。应用(单平面桥)