首页> 外文期刊>Computers & operations research >A flexible job shop scheduling approach with operators for coal export terminals - A mature approach
【24h】

A flexible job shop scheduling approach with operators for coal export terminals - A mature approach

机译:运营商针对煤炭出口码头的灵活的车间调度方法-一种成熟的方法

获取原文
获取原文并翻译 | 示例

摘要

This article presents an improved scheduling approach for optimising the activities of a coal export terminal (CET) and includes for the first time, new methodology for handling blending, concurrency, deballasting delays, dual reclaiming and through loading. The proposed methodology can be applied to bulk materials import and export terminals and other very complex scheduling scenarios whose activities require multiple resources to be present and operating. It is also adaptable to industries with similarly complex scheduling environments with concurrency requirements and pre-emption. This scheduling problem is highly intricate and is far more challenging than traditional problems. As such it has been necessary to develop an improved meta-heuristic algorithm, with additional resource assignment chromosome and improved perturbation operators for pre-emption handling and resource assignment. A comprehensive suite of test problems is solved to demonstrate the efficacy of our approach and the capability to solve scenarios with the aforementioned features. (C) 2019 Elsevier Ltd. All rights reserved.
机译:本文介绍了一种用于优化煤炭出口码头(CET)活动的改进的调度方法,并首次包括处理混合,并发,压载延迟,双重回收和通过装载的新方法。所提出的方法可以应用于散装物料进出口码头和其他非常复杂的调度方案,这些方案的活动需要多个资源才能呈现和运行。它还适用于具有并发要求和抢占的类似复杂调度环境的行业。这个调度问题非常复杂,比传统问题更具挑战性。因此,有必要开发一种改进的元启发式算法,具有额外的资源分配染色体和用于先占处理和资源分配的改进的扰动算子。解决了一套综合的测试问题,以证明我们的方法的有效性以及解决具有上述功能的方案的能力。 (C)2019 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号