首页> 外文期刊>Computers & operations research >Simultaneous disruption recovery of a train timetable and crew roster in real time
【24h】

Simultaneous disruption recovery of a train timetable and crew roster in real time

机译:同时实时恢复火车时刻表和人员名册

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes the development and implementation of an optimization model used to resolve disruptions to an operating schedule in the rail industry. Alterations to the existing train timetable and crewing roster are made simultaneously in real time—previous treatments in the literature have always decoupled these two problems and solved them in series. An integer programming model is developed that constructs a train timetable and crew roster. This model contains two distinct blocks, with separate variables and constraints for the construction of the train timetable and crew roster, respectively. These blocks are coupled by piece of work sequencing constraints and shift length constraints, which involve variables from both blocks. This unique parallel construction process is then used as the basis of a method to deal with the resolution of train disruptions in realtime. Favourable results are presented for both the combined train/driver scheduling model and the real-time disruption recovery model.
机译:本文描述了优化模型的开发和实现,该模型用于解决铁路行业对运营计划的干扰。实时同时更改现有的火车时刻表和人员名册-文献中的先前处理方法始终使这两个问题脱钩并串联解决。开发了一个整数编程模型,该模型构造了火车时刻表和机组人员名册。该模型包含两个不同的块,分别具有分别用于构建火车时刻表和机组人员名册的变量和约束。这些块由工作顺序约束和班次长度约束耦合在一起,这涉及两个块中的变量。然后,将这种独特的并行构建过程用作实时解决列车中断的方法的基础。对于组合的火车/驾驶员调度模型和实时中断恢复模型,都给出了令人满意的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号