首页> 外文期刊>Computers & operations research >A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity
【24h】

A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity

机译:关于到期窗口分配和单机调度的说明,其中作业恶化且费率修改活动

获取原文
获取原文并翻译 | 示例

摘要

This note considers a single machine scheduling and due-window assignment problem, in which the processing time of a job is a linear function of its starting time and the job-independent deterioration rates are identical for all jobs. We allow an option for performing a rate-modifying activity for changing the normal processing times of the jobs following this activity. The objective is to schedule the jobs, the due-window and the rate-modifying activity so as to minimize the sum of earliness, tardiness and due-window starting time and due-window size costs. We introduce a polynomial solution for the problem.
机译:本说明考虑了单个机器调度和到期窗口分配问题,其中作业的处理时间是其开始时间的线性函数,并且与作业无关的劣化率对于所有作业都是相同的。我们提供了一个选项,用于执行费率修改活动,以更改此活动之后作业的正常处理时间。目的是安排工作,适当的窗口和调整价格的活动,以最大程度地减少早期,迟到和适当的窗口开始时间以及适当的窗口大小成本。我们介绍了该问题的多项式解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号