首页> 外文期刊>Computers & operations research >An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem
【24h】

An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem

机译:多模式资源受限项目调度问题的有效分配算法估计

获取原文
获取原文并翻译 | 示例

摘要

In this paper, an estimation of distribution algorithm (EDA) is proposed to solve the multi-mode resource-constrained project scheduling problem (MRCPSP). In the EDA, the individuals are encoded based on the activity-mode list (AML) and decoded by the multi-mode serial schedule generation scheme (MSSGS), and a novel probability model and an updating mechanism are proposed for well sampling the promising searching region. To further improve the searching quality, a multi-mode forward backward iteration (MFBI) and a multi-mode permutation based local search method (MPBLS) are proposed and incorporated into the EDA based search framework to enhance the exploitation ability. Based on the design-of-experiment (DOE) test, suitable parameter combinations are determined and some guidelines are provided to set the parameters. Simulation results based on a set of benchmarks and comparisons with some existing algorithms demonstrate the effectiveness of the proposed EDA.
机译:为了解决多模式资源受限项目调度问题(MRCPSP),提出了一种估计分布算法(EDA)。在EDA中,基于活动模式列表(AML)对个体进行编码,并通过多模式串行计划生成方案(MSSGS)对其进行解码,并提出了一种新颖的概率模型和更新机制来对有希望的搜索进行很好的采样区域。为了进一步提高搜索质量,提出了一种多模式前向后向迭代(MFBI)和一种基于多模式置换的局部搜索方法(MPBLS),并将其结合到基于EDA的搜索框架中以提高开发能力。根据实验设计(DOE)测试,确定合适的参数组合,并提供一些准则来设置参数。基于一组基准并与一些现有算法进行比较的仿真结果证明了所提出的EDA的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号