首页> 外文期刊>Computers & operations research >Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1)
【24h】

Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1)

机译:辅助功能窗口装配线问题级别1(AWALBP-L1)的启发式方法和模拟退火程序

获取原文
获取原文并翻译 | 示例
       

摘要

In some assembly lines, the workpieces are larger than the workstations. This implies that at a given instant the workstations have access to only a portion of the workpieces. In this context, the accessibility windows assembly line balancing problem (AWALBP) arises. In the AWALBP, the cycle is split into forward steps and stationary stages. The workpieces advance during the forward steps and the tasks are processed during the stationary stages. In each stationary stage, the workstations have access to different parts of the workpieces. This work solves the first level of AWALBP (AWALBP-L1), which consists in assigning the tasks among the workstations and stationary stages. Specifically, it is considered the AWALBP-L1 case in which the tasks can be processed in several workstations and their processing times depend on the workstation in which the tasks are processed. To solve the problem, we propose several heuristics and simulated annealing procedures. An extensive computational experiment is carried out to evaluate their performance. (C) 2015 Elsevier Ltd. All rights reserved.
机译:在某些装配线中,工件比工作站大。这意味着在给定的瞬间,工作站只能访问一部分工件。在这种情况下,出现了辅助功能窗口装配线平衡问题(AWALBP)。在AWALBP中,循环分为前进步骤和固定阶段。工件在前进步骤中前进,而任务在固定阶段中进行处理。在每个固定阶段,工作站都可以访问工件的不同部分。这项工作解决了AWALBP(AWALBP-L1)的第一级问题,它包括在工作站和固定阶段之间分配任务。具体而言,认为是AWALBP-L1情况,其中可以在多个工作站中处理任务,并且它们的处理时间取决于在其中处理任务的工作站。为了解决该问题,我们提出了几种启发式方法和模拟退火程序。进行了广泛的计算实验以评估其性能。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号