首页> 外文期刊>Computers & operations research >New simple constructive heuristic algorithms for minimizing total flow-time in the permutation flowshop scheduling problem
【24h】

New simple constructive heuristic algorithms for minimizing total flow-time in the permutation flowshop scheduling problem

机译:新的简单构造启发式算法,用于最小化置换流程车间调度问题中的总流程时间

获取原文
获取原文并翻译 | 示例

摘要

This paper develops a set of new simple constructive heuristic algorithms to minimize total flow-time for an n-jobs x m-machines permutation flowshop scheduling problem. We first propose a new iterative algorithm based on the best existing simple heuristic algorithm, and then integrate new indicator variables for weighting jobs into this algorithm. We also propose new decision criteria to select the best partial sequence in each iteration of our algorithm. A comprehensive numerical experiment reveals that our modifications and extensions improve the effectiveness of the best existing simple heuristic without affecting its computational efficiency. (C) 2016 Elsevier Ltd. All rights reserved.
机译:本文开发了一组新的简单构造启发式算法,以最大程度地减少n作业x m机器排列流水车间调度问题的总流时间。我们首先基于现有的最佳简单启发式算法提出一种新的迭代算法,然后将用于加权作业的新指标变量集成到该算法中。我们还提出了新的决策标准,以在算法的每次迭代中选择最佳的部分序列。全面的数值实验表明,我们的修改和扩展提高了现有最佳最佳启发式算法的效率,而不会影响其计算效率。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号