首页> 外文期刊>Computers & operations research >Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
【24h】

Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines

机译:使用专用机器的两阶段柔性流水车间中的制造模型的调查和扩展

获取原文
获取原文并翻译 | 示例

摘要

This study considers the manufacturing environments in which m + 1 machines are configured as two stage flexible flow shops with dedicated machines (F2DM). The F2DM scheduling problems arise naturally from practical production and fabrication systems, and they are classified into two categories, whose machine settings are antithetical to each other. In model 1, a single common bottleneck machine is installed at stage 1 and m parallel dedicated machines comprise stage 2. The second model has the m dedicated machines at stage 1 and the bottleneck machine at stage 2. Categorizing the literature according to the performance metrics, we survey the existing research results of the two models and propose several new solution procedures with improved computational complexity. The complexity results are summarized, and suggestions are made for future research. (C) 2018 Elsevier Ltd. All rights reserved.
机译:本研究考虑了将m +1台机器配置为带有专用机器(F2DM)的两阶段灵活流水车间的制造环境。 F2DM调度问题自然是由实际的生产和制造系统引起的,它们分为两类,它们的机器设置相互对立。在模型1中,在阶段1上安装了一个通用瓶颈机器,而在阶段2上安装了m台并行专用机器。第二个模型在阶段1中有m台专用机器,而在阶段2上有瓶颈机器。 ,我们调查了这两种模型的现有研究结果,并提出了几种具有改进的计算复杂度的新解决方案程序。总结了复杂性结果,并为以后的研究提出了建议。 (C)2018 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号