Online scheduling problems with flexible release dates: Applications to infrastructure restoration

机译:具有灵活发布日期的在线计划问题:基础架构恢复的应用

获取原文
获取原文并翻译 | 示例
           

摘要

We consider scheduling problems with the new concept of flexible release dates under an online optimization framework. A flexible release date is one where the traditional release date of a specific operation can be moved earlier in time, specifically to the completion time of an associated supplementary operation. In this context, we examine two classes of parallel identical machines: those that perform supplementary operations to alter release dates and those that perform installation operations to change the network characteristics. We further consider multi-function machines that can perform both supplementary and installation operations. The release date of an operation is often determined by events outside the knowledge of the decision-maker. Therefore, we consider scheduling problems in an online setting to model the lack of- and evolution of information about the release dates of tasks. Motivated by infrastructure restoration after an extreme event, we consider flexible release dates for an integrated network design and scheduling problem that seeks to improve the performance of a network over time by selecting and scheduling operations that will change the network characteristics. To solve these problems, we propose heuristic dispatching rules whose solutions are benchmarked against the solutions of a mixed integer programming formulation. Using a realistic infrastructure network, we perform computational tests; the results of these tests demonstrate the ability of the dispatching rule to find high-quality solutions in real time and quickly adapt to the arrival of new information. From the analysis of these results, we deduce policy insights regarding the role of flexible release dates and the machine fleet configuration. (C) 2017 Elsevier Ltd. All rights reserved.
机译:我们考虑采用在线优化框架下的灵活发布日期这一新概念来安排问题。灵活下达日期是指可以将特定操作的传统下达日期提前移到特定日期的时间,特别是可以移到相关补充操作的完成时间。在这种情况下,我们研究了两类并行的相同机器:执行补充操作以更改发行日期的机器和执行安装操作以更改网络特性的机器。我们进一步考虑可以同时执行补充和安装操作的多功能机器。操作的发布日期通常由决策者不了解的事件确定。因此,我们考虑在在线环境中安排问题,以模拟关于任务发布日期的信息的缺乏和发展。受极端事件后基础结构恢复的激励,我们考虑灵活的发布日期来解决集成网络设计和调度问题,该问题旨在通过选择和调度将改变网络特性的操作来逐步改善网络性能。为了解决这些问题,我们提出了启发式调度规则,其解决方案以混合整数规划公式的解决方案为基准。使用现实的基础架构网络,我们执行计算测试;这些测试的结果证明了调度规则能够实时查找高质量解决方案,并迅速适应新信息的到达。通过对这些结果的分析,我们得出有关灵活发布日期的作用和机器机群配置的政策见解。 (C)2017 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号