Construction projects with outdoor operations are affected by time-varying weather conditions. However, most existing research on stochastic resource-constrained project scheduling problems (SRCPSPs) considers activity duration as a random variable from a time-independent distribution. To address this issue, this study investigates SRCPSP under time-varying weather conditions; an improved estimation of distribution algorithm (EDA) including a ranking and selection method using common random numbers is proposed for enhancing the per-formance of project scheduling. The benchmark J120 dataset from PSPLIB and a practical case of windfarm construction are used to validate the improved EDA. For three randomly selected cases from the J120 dataset, the improved EDA can reduce the expected makespan by 17.0, 29.4, and 12.5 days when compared with deter-ministic scheduling. The corresponding makespan reductions obtained by the original EDA are 10.8, 22.7, and 7.1 days. Similarly, the improved EDA obtains 23% higher expected makespan reduction for the practical case.
机译:具有户外操作的建设项目受到时变天气条件的影响。但是,大多数现有关于随机资源受限的项目调度问题的研究(SRCPSPS)将活动持续时间视为随机变量,从时间无关分发。为了解决这个问题,本研究调查了在时变天气条件下的SRCPSP;提出了一种改进的分布算法(EDA)估计,包括使用常见随机数的排名和选择方法,以增强项目调度的每种兆胎。 PSPLIB的基准J120数据集和Windfarm建筑的实际情况用于验证改进的EDA。对于来自J120数据集的三个随机选择的案例,改进的EDA可以将预期的Mapspan减少17.0,29.4和12.5天,而导致部门的调度相比。由原始EDA获得的相应Makespan减少为10.8,22.7和7.1天。同样,改进的EDA获得了实际情况的预期薄荷预期的23%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号