首页> 外文期刊>Computers & Industrial Engineering >Application of a fuzzy-logic based model for risk assessment in additive manufacturing R&D projects
【24h】

Application of a fuzzy-logic based model for risk assessment in additive manufacturing R&D projects

机译:基于模糊逻辑的模糊逻辑模型在加油制造研发项目中的风险评估

获取原文
获取原文并翻译 | 示例
       

摘要

Experts from industry and academics have highlighted Additive Manufacturing (AM) as a technology that is revolutionizing manufacturing. AM is a process that consists of creating a three-dimensional object by incorporating layers of a material such as metal or polymer. This research studies risks associated with AM R&D Project Management. A significant set of risks with a potential negative impact on project objectives in terms of scope, schedule, cost and quality are identified through an extensive literature review. These risks are assessed through a survey answered by ninety academics and professionals with noteworthy sector expertise. This process is made by the measurement of two parameters: likelihood of occurrence and impact on project objectives. According to the responses of the experts, the level of relevance of each risk is calculated, innovatively, through a fuzzy logic-based model, specifically developed for this study, implemented in MATLAB Fuzzy Logic Toolbox. The results of this study show that the risks "Defects occurring during the manufacturing process", "Defective design", "Poor communication in the project team" and "Insufficient financing" are determined as the most critical in AM R&D Project Management. The proposed model is presented as a powerful new tool for organizations and academics, to prioritize the risks that are more critical to develop appropriate response strategies to achieve the success of their projects.
机译:工业和学者的专家突出了添加剂制造(AM)作为革命性化制造的技术。 AM是一种通过结合诸如金属或聚合物的材料层来创建三维物体的过程。本研究研究与AM研发项目管理有关的风险。通过广泛的文献综述确定了对项目目标具有潜在负面影响的一系列风险,并通过广泛的文献综述确定了对项目目标的影响。这些风险通过由九十学者和专业人士的专业人士回答的调查进行评估。该过程通过测量两个参数:发生的可能性和对项目目标的影响。根据专家的答复,通过专门为本研究开发的模糊逻辑的模型来计算每个风险的相关程度,以Matlab模糊逻辑工具箱在本研究中实现。本研究的结果表明,在制造过程中发生的缺陷“,”缺陷的设计“,”项目团队的差的沟通“和”融资不足“的结果被认为是AM研发项目管理中最关键的。拟议的模型作为组织和学者的强大新工具,优先考虑制定适当的响应策略以实现其项目成功的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号