...
首页> 外文期刊>Computers & Industrial Engineering >Two general forms of approximation for determining near optimal inspection intervals with non-zero inspection and replacement times in a deteriorating production system
【24h】

Two general forms of approximation for determining near optimal inspection intervals with non-zero inspection and replacement times in a deteriorating production system

机译:在恶化的生产系统中,两种近似的近似形式可用于确定具有非零检验和更换时间的最佳检验间隔

获取原文
获取原文并翻译 | 示例
           

摘要

The construction and solution of the next simplest but more realistic profit model for an exponential shift (or failure) distribution were presented in Ben-Daya and Hariga (B&H) [Ben-Daya, M., & Hariga, M. (1998). A maintenance inspection model: Optimal and heuristic solutions. International Journal of Quality and Reliability Management, 15, 481-488], in which the model presented looks much more complicated than the simplest profit model proposed by Baker [Baker, M. J. C. (1990). How often should a machine be inspected? International Journal of Quality and Reliability Management, 7, 14-18]. However, once we confer economic meanings to some mathematical expressions and rewrite the whole model, the revised model not only becomes less complicated and more comprehensible than the original one but also draws a closer analogy with Baker's model and the associated solution algorithms.rnWe also develop two distinct sets of general explicit formulae and present two corresponding heuristic algorithms for solving B&H's model. The examples show that either of these new algorithms for determining a near optimal inspection interval for a deteriorating (or an imperfect) production system is not only more close to the optimum but also more efficient computationally than the one suggested by B&H (1998), and can give the value to any required degree of accuracy.rnThe main purpose of this article is threefold: (1) to confer economic meanings to some expressions, (2) to rewrite the model and the Proof of Theorem 1, and (3) to introduce general exponential and logarithmic forms of approximation for further approximating optimal inspection intervals and to give merits and demerits of the two algorithms.
机译:Ben-Daya和Hariga(B&H)[Ben-Daya,M.和Hariga,M.(1998)介绍了下一个最简单但更现实的指数转移(或失败)分布利润模型的构造和解决方案。维护检查模型:最优和启发式解决方案。 International Journal of Quality and Reliability Management,15,481-488],其中提出的模型看起来比Baker提出的最简单的利润模型要复杂得多[Baker,M. J. C.(1990)。机器应多久检查一次?国际质量和可靠性管理杂志,7,14-18]。但是,一旦我们将经济意义赋予某些数学表达式并重写了整个模型,修订后的模型不仅比原始模型变得不那么复杂且更易于理解,而且可以与Baker模型和相关的求解算法进行更接近的比喻。两组截然不同的通用显式公式,并提出了两种对应的启发式算法来求解B&H模型。实例表明,与B&H(1998)提出的算法相比,这些用于确定恶化的(或不完善的)生产系统的最佳检查间隔的新算法不仅更接近最佳算法,而且计算效率更高。可以将值赋予任何所需的精度。rn本文的主要目的是三方面的:(1)为某些表达式赋予经济意义,(2)重写模型和定理证明,以及(3)介绍一般的指数和对数近似形式,以进一步近似最佳检查间隔,并给出两种算法的优缺点。

著录项

  • 来源
    《Computers & Industrial Engineering》 |2009年第2期|446-459|共14页
  • 作者

    Kit-Nam; Francis Leung;

  • 作者单位

    Department of Management Sciences, City University of Hong Kong, 83 Tat Chee Avenue, Kowloon Tong, Hong Kong Curtin University of Technology, WA, Australia;

    Department of Management Sciences, City University of Hong Kong, 83 Tat Chee Avenue, Kowloon Tong, Hong Kong Curtin University of Technology, WA, Australia Department of Management Sciences, City University of Hong Kong, 83 Tat Chee Avenue, Kowloon Tong, Hong Kong;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    inspection; replacement; cost; profit; machine; shift;

    机译:检查;替代;成本;利润;机;转移;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号