首页> 外文期刊>Computers & Industrial Engineering >Optimal production run length in deteriorating production processes with fuzzy elapsed time
【24h】

Optimal production run length in deteriorating production processes with fuzzy elapsed time

机译:恶化生产过程中经过时间模糊的最佳生产运行长度

获取原文
获取原文并翻译 | 示例

摘要

This paper investigates the optimal production run length in deteriorating production processes, where the elapsed time until the production process shifts is characterized as a fuzzy variable, also the setup cost and the holding cost are characterized as fuzzy variables, respectively. A mathematical formula representing the expected average cost per unit time is derived, and some properties are obtained to establish an efficient solution procedure. Since there is no closed-form expression for the optimal production run length, an approximate solving approach is presented. Finally, two numerical examples are given to illustrate the procedure of searching the optimal solutions.
机译:本文研究了恶化的生产过程中的最佳生产运行长度,其中直到生产过程转移为止的经过时间被描述为模糊变量,设置成本和持有成本也分别被描述为模糊变量。推导了代表每单位时间预期平均成本的数学公式,并获得了一些属性以建立有效的求解程序。由于没有最优生产运行长度的闭式表达式,因此提出了一种近似求解方法。最后,给出了两个数值例子来说明寻找最优解的过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号