首页> 外文期刊>Computers & Industrial Engineering >A network-based approach to the multi-activity combined timetabling and crew scheduling problem: Workforce scheduling for public health policy implementation
【24h】

A network-based approach to the multi-activity combined timetabling and crew scheduling problem: Workforce scheduling for public health policy implementation

机译:基于网络的多活动时间表和人员调度问题合并方法:用于公共卫生政策实施的人员调度

获取原文
获取原文并翻译 | 示例
           

摘要

This paper introduces the multi-activity combined timetabling and crew scheduling problem. The goal of this problem is to schedule the minimum number of workers required in order to successfully visit a set of customers characterized by services needed matched against schedule availability. Two solution strategies are proposed. The first is based on mathematical programming whilst the second uses a heuristic procedure in order to reduce computational time. The proposed model combines timetabling with crew scheduling decisions in one mixed integer programming model which considers multiple activities. The algorithms are tested on randomly generated and real instances provided by the Health to School Initiative, a program based at Bogota's local Health Department. The results show that the Initiative can increase its coverage by up to 68% using the proposed heuristic approach as a planning process tool.
机译:本文介绍了多活动组合时间表和机组调度问题。这个问题的目的是安排最少数量的工作人员,以便成功拜访一组具有所需服务与时间表可用性匹配的客户。提出了两种解决方案。第一种基于数学编程,而第二种则使用启发式过程以减少计算时间。所提出的模型在一个考虑了多个活动的混合整数规划模型中将时间表和机组调度决策结合在一起。该算法在由Bogota当地卫生部门制定的Health to School Initiative计划提供的随机生成的真实实例上进行了测试。结果表明,使用提议的启发式方法作为计划过程工具,该计划可以将覆盖率提高多达68%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号