...
首页> 外文期刊>Computers & Industrial Engineering >An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders
【24h】

An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders

机译:在计划有缺货的单阶段制造系统中,具有返工流程的EPQ模型的替代分析和解决程序

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper revisits the work by Cardenas-Barron (Cardenas-Barron, L E., (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers and Industrial Engineering, 57(3), 1105-1113). The optimal solution condition is analyzed using the production time and the time to eliminate backorders as decision variables instead of the classical decisions variables of lot and backorder quantities. This new approach leads to an alternative inventory policy for imperfect quality items when the optimal production time is less than the optimal time. This is a new method that has not been explored before; it improves and complements the work by Cardenas-Barron (2009) and provides interesting managerial insights. An easy to apply solution procedure is provided to obtain the optimal policy. Finally, numerical examples are solved to illustrate our results.
机译:本文回顾了Cardenas-Barron(Cardenas-Barron,L.,(2009)的工作。在有计划的缺货的单阶段制造系统上,通过返工过程实现了经济生产数量。计算机与工业工程,57(3),1105 -1113)。使用生产时间和消除延期交货的时间作为决策变量,而不是批次和延期交货数量的经典决策变量,来分析最佳解决方案条件。当最佳生产时间小于最佳时间时,这种新方法导致了针对质量不理想产品的替代库存策略。这是一种以前没有探索过的新方法。它改进并补充了Cardenas-Barron(2009)的工作,并提供了有趣的管理见解。提供了易于应用的解决方案过程,以获得最佳策略。最后,通过数值例子说明了我们的结果。

著录项

  • 来源
    《Computers & Industrial Engineering》 |2013年第2期|748-755|共8页
  • 作者单位

    Department of Industrial and Systems Engineering, Chung Yuan Christian University, Chungti 32023, Taiwan, ROC;

    Department of Industrial and Systems Engineering, Chung Yuan Christian University, Chungti 32023, Taiwan, ROC;

    Department of Industrial and Systems Engineering, School of Engineering, Tecnologico de Monterrey, E. Garza Sada 2501 Sur., C.P. 64 849 Monterrey, N.L., Mexico;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    EPQ; rework; defective items; backorders;

    机译:EPQ;重工;有缺陷的物品;缺货;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号