...
首页> 外文期刊>Computers & Industrial Engineering >Unrelated parallel machine scheduling with dedicated machines and common deadline
【24h】

Unrelated parallel machine scheduling with dedicated machines and common deadline

机译:具有专用机器和共同期限的无关的并行机器调度

获取原文
获取原文并翻译 | 示例

摘要

This paper addresses a scheduling problem in the manufacturing of Polyvinyl Chloride pipes. There are two main attributes of PVC pipes: diameter and color. Each attribute has a corresponding attribute setup time and usually has several different levels. Each extruder produces different PVC pipe products based on the diameters as large, middle and small. The alternatives exist between these extruders, where the large and the middle type extruders can be used to produce the PVC pipes with the other diameters; the small type extruders can be used to produce the PVC pipes with middle diameters but cannot produce those with large diameters. The processing times are longer in all of the alternatives among different types of extruders. The objective is to minimize the total completion time for the unrelated parallel machine problem. Three dedicated machine heuristics are proposed herein for the problem and have been evaluated by comparing with the current scheduling method used in the case plant. The computational results show that the proposed constructive heuristics outperform the current scheduling method with significant improvements and can be used to solve large-size problems in reasonable computational times.
机译:本文解决了聚氯乙烯管材生产中的调度问题。 PVC管道有两个主要属性:直径和颜色。每个属性都有一个对应的属性设置时间,通常具有几个不同的级别。每个挤出机基于大,中,小直径生产不同的PVC管产品。在这些挤出机之间存在替代方案,其中大型和中型挤出机可用于生产其他直径的PVC管。小型挤出机可用于生产中等直径的PVC管,但不能生产大直径的PVC管。在不同类型的挤出机中,所有替代方案的处理时间都更长。目的是最大程度地减少无关并行机问题的总完成时间。本文针对该问题提出了三种专用的机器启发法,并已通过与案例工厂中使用的当前调度方法进行比较进行了评估。计算结果表明,所提出的构造启发式算法在性能上明显优于现有的调度方法,可以在合理的计算时间内解决大型问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号