...
首页> 外文期刊>Computers & Chemical Engineering >Production Scheduling Of A Large-scale Industrial Continuous Plant: Short-term And Medium-term Scheduling
【24h】

Production Scheduling Of A Large-scale Industrial Continuous Plant: Short-term And Medium-term Scheduling

机译:大型工业连续工厂的生产计划:短期和中期计划

获取原文
获取原文并翻译 | 示例
           

摘要

In this work, we describe a framework for short-term and medium-term scheduling of a large-scale industrial continuous plant. For medium-term scheduling, two sub-problems are solved using a rolling-horizon based decomposition scheme. An upper-level model is used to find the optimal number of products, and the length of the time horizon to be considered for solving the lower level short-term scheduling problem. At the lower level, we proposed an improved model for short-term scheduling of continuous processes using unit-specific event-based continuous-time representation. The proposed formulation is demonstrated on a large-scale industrial case study comprising up to 100 units with 1/3 processing and 2/3 storage units operating in a continuous-mode for producing more than 100 different products over a one month time horizon.
机译:在这项工作中,我们描述了大型工业连续工厂的短期和中期调度框架。对于中期调度,使用基于滚动水平的分解方案解决了两个子问题。上层模型用于找到最佳产品数量,以及解决下层短期调度问题要考虑的时间范围长度。在较低的级别上,我们提出了一种改进的模型,该模型使用基于特定于单元的事件的连续时间表示来对连续过程进行短期调度。在大规模工业案例研究中证明了所提议的配方,该案例包括多达100个单元,其中1/3个处理单元和2/3个存储单元以连续模式运行,以在一个月的时间范围内生产100多种不同的产品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号