On-site immunity test on supervisory control and data acquisition for industrial electrical power system

机译:工业电力系统监控与数据采集的现场抗扰度测试

获取原文
获取原文并翻译 | 示例
       

摘要

The paper performs a preliminary analysis of the frequency behaviour of signal and power lines, in order to define a procedure for on-site test of supervisory control and data acquisition (SCADA)systems in their final environment, during the commissioning stage. The first section of the paper briefly investigates the disturbances that are industrial environment. The procedure shall start after the SCADA positioning, when all the field cables are installed and the field sensors and actuators are connected. Critical frequencies are identified for the SCADA system, arising from the actual layout and cable arrangement.
机译:本文对信号线和电源线的频率行为进行了初步分析,以定义在调试阶段在最终环境中对监控系统和数据采集(SCADA)系统进行现场测试的程序。本文的第一部分简要研究了作为工业环境的干扰。当所有现场电缆均已安装且现场传感器和执行器已连接时,该程序应在SCADA定位后开始。根据实际布局和电缆布置,确定了SCADA系统的关键频率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号