首页> 外文期刊>Cleanroom technology >LIFT-OFF FOR CLEANROOM CONSTRUCTION (CRC) SPACE TECHNOLOGY PROJECT
【24h】

LIFT-OFF FOR CLEANROOM CONSTRUCTION (CRC) SPACE TECHNOLOGY PROJECT

机译:洁净室建设(CRC)空间技术项目的起落架

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Cleanroom design and build specialist Clean Room Construction (CRC) has started on site to build a £2.7m cleanroom facility for RAL Space in Oxfordshire, UK. The 1,372m~2 facility at the space and technology centre in Oxfordshire is one of the tallest cleanroom facilities to be built by the UK company. When completed, the suite of 15 cleanrooms and five changing areas will be used for the assembly and testing of satellite instrumentation. CRC is working in collaboration with Willmott Dixon Construction to deliver the challenging project in a 26-week timeframe. The specification includes the construction of cleanrooms with walk-on and suspended ceilings, some of which exceed 12m in height and a requirement for self-supporting modular wall panels including 6.5m x 6m roller door access.
机译:洁净室设计和建造专家洁净室建设(CRC)已开始在现场建造,用于为英国牛津郡的RAL Space建造一座耗资270万英镑的洁净室设施。这座位于牛津郡太空与技术中心的1,372m〜2设施是英国公司建造的最高洁净室设施之一。完成后,将使用由15个无尘室和5个更衣区域组成的套件来组装和测试卫星仪器。 CRC与Willmott Dixon Construction合作,在26周的时间内交付了具有挑战性的项目。该规范包括无尘室的建造以及步入式和悬浮式天花板,其中一些天花板的高度超过12m,并且需要自支撑式模块化墙板,包括6.5m x 6m的卷门入口。

著录项

  • 来源
    《Cleanroom technology》 |2014年第12期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号