...
首页> 外文期刊>Cleanroom technology >Mach-Aire awarded major contract by Brookfleld Multiplex
【24h】

Mach-Aire awarded major contract by Brookfleld Multiplex

机译:马赫-艾尔(Mach-Aire)被Brookfield Multiplex授予主要合同

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Mach-Aire has been awarded a major aseptic cleanroom contract by Brookfield Multiplex, the company responsible for the design and construction of the New South Glasgow Hospitals, which is due to be completed in Spring 2015. Mach-Aire has been appointed to provide a turnkey solution; building, commissioning and validating a complex aseptic pharmaceutical facility within the new hospital. Once complete, the facility will be used to prepare and dispense cytotoxic and non-cytotoxic medication.
机译:Mach-Aire已由Brookfield Multiplex授予一项主要的无菌洁净室合同,该公司负责设计和建造新南格拉斯哥医院,该工程将于2015年春季完工。Mach-Aire已被任命提供交钥匙工程解;在新医院内建设,调试和验证复杂的无菌制药设施。一旦完成,该设施将用于制备和分配细胞毒性和非细胞毒性药物。

著录项

  • 来源
    《Cleanroom technology》 |2014年第3期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号