...
首页> 外文期刊>Cleanroom technology >Project at Zollner completes commission and qualification
【24h】

Project at Zollner completes commission and qualification

机译:Zollner的项目完成了委托和鉴定

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

NETHERLANDS Cleanroom builder Brecon Group has completed the second phase of a project for Zollner, the German electronics company, in cooperation with PP4C(E) partners. The 1,000 sqm facility was completed in December, following the first phase, which involved commissioning 2,500 sqm of ISO 14644 Class 7 space. Brecon also revealed that "The building was not able to support the construction of the cleanroom, and therefore the team had to build the required steel construction for the support of the walls and ceiling as well as the air ducts," The complete HVAC installation was from Stulz Germany.
机译:荷兰洁净室制造商Brecon Group与PP4C(E)合作伙伴合作,已完成了为德国电子公司Zollner进行的项目的第二阶段。在第一阶段之后,占地1,000平方米的工厂于12月竣工,涉及调试2,500平方米的ISO 14644 7级空间。布雷肯还透露:“该建筑无法支持无尘室的建设,因此,团队必须建造所需的钢结构以支撑墙壁和天花板以及通风管道。”来自德国的Stulz。

著录项

  • 来源
    《Cleanroom technology》 |2020年第1期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号