首页> 外文期刊>Civil Engineering >Corps and Nature Conservancy Join Forces on Dam Control
【24h】

Corps and Nature Conservancy Join Forces on Dam Control

机译:兵团与大自然保护协会携手控制大坝

获取原文
获取原文并翻译 | 示例
           

摘要

For most of its 34-year history, the Green Dam―located on the Green River in Kentucky 60 mi (96 km) upstream of Mammoth Cave National Park―has been operated with a drawdown regime requiring the steady release of water at about 1,000 cfs (28 m~3/s) between the months of September and November. So it undoubtedly came as a surprise to some downstream residents when in December 2002, for the first time in nearly 20 years, water was released from the dam at the maximum capacity, 8,000 cfs (226 m~3/s). For most of the day the river rushed hard through its course and overflowed into the flatlands near its edges―as if a heavy storm had swept through the area.
机译:在其34年的大部分历史中,绿水坝位于猛Ma洞国家公园上游60英里(96公里)肯塔基州绿河上,其回灌状态需要稳定地释放约1,000 cfs的水在9月到11月之间(28 m〜3 / s)。因此,毫无疑问,2002年12月,这是近20年来的第一次,大坝以最大流量8000 cfs(226 m〜3 / s)的速度释放了水,使下游居民感到惊讶。在一天中的大部分时间里,河水艰难地冲向河道,并溢出到其边缘附近的平坦土地中,仿佛一场大风暴席卷了该地区。

著录项

  • 来源
    《Civil Engineering》 |2003年第3期|p.16|共1页
  • 作者

    Greg Brouwer;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号