State Highway 82 in Colorado is the primary two-lane route between Aspen and Glenwood Springs. The highway follows the general path of Roaring Fork River, which flows in a northwesterly direction from Aspen down to its confluence with the Colorado River. Under the auspices of the Colorado Department of Transportation (DOT), a project was begun in the 1990s to expand a 3.4 mi (5.5 km) section of the state highway in Snowmass Canyon from two lanes to four, creating two up-valley (Aspen-bound) lanes and two down-valley (Glenwood Springs-bound) lanes. The original environmental impact statement was submitted in 1991, the record of decision coming in 1993. Preliminary design work began in 1995, and work on the final designs began four years later.Yeh and Associates, of Denver, carried out geological and geotechnical investigations in 1999 and the following year provided retaining and foundation designs. The up-valley lanes were to traverse the slopes above the existing two-lane highway, whereas the down-valley lanes would follow the general alignment of the existing highway. It was necessary to realign and raise the elevation of the existing lanes to accommodate current highway design speeds, expected traffic volumes, and sight distances.
机译:科罗拉多州的82号州际公路是阿斯彭和格伦伍德温泉之间的主要两车道路线。高速公路沿咆哮叉河的总路线行驶,从阿斯彭向西北方向一直流到与科罗拉多河的汇合处。在科罗拉多州交通运输部(DOT)的主持下,于1990年代启动了一个项目,将斯诺马斯峡谷的州际公路的3.4英里(5.5公里)段从两条车道扩建为四个,形成两个上谷线)和两个下谷(格伦伍德温泉)线。最初的环境影响声明于1991年提交,决定的记录于1993年提交。1995年开始了初步设计工作,四年之后开始了最终设计工作。丹佛的Yeh and Associates在加利福尼亚州进行了地质和岩土调查。 1999年和the年提供了挡土墙和地基设计。上谷车道将穿越现有两车道高速公路上方的斜坡,而下谷车道将遵循现有高速公路的总体路线。有必要重新调整并提高现有车道的高度,以适应当前的高速公路设计速度,预期的交通量和视距。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号