...
首页> 外文期刊>Circuitree >PV Equipment Suppliers Post Record Backlogs in Q410
【24h】

PV Equipment Suppliers Post Record Backlogs in Q410

机译:光伏设备供应商在Q410中记录未完成订单

获取原文
获取原文并翻译 | 示例

摘要

Quarterly PV manufacturing equipment spending by c-Si ingot-to-module and thin-film panel producers grew for the sixth consecutive quarter during Q410 to USD2.9B, as double-digit Q/Q manufacturing capacity growth continued to grip the PV industry. Rising equipment demand from Asian cell manufacturers will be the primary driver of global industry revenues during 2011, forecast to grow from $10.7B in 2010 to $11.7B.Driven by vertical integration aspirations of tier 1 Chinese c-Si producers and strong investment into existing and emerging thin-film technologies, a further 1.25 GW of quarterly manufacturing capacity came online during Q410, bringing annualized c-Si cell and thin-film panel capacity added during 2010 to 11.5 GW, according to the latest Solar-buzz* PV Equipment Quarterly report.
机译:c-Si锭至模块和薄膜面板生产商的季度PV制造设备支出在Q410期间连续第六个季度增长至USD2.9B,这是因为两位数的Q / Q制造能力增长继续紧握PV行业。来自亚洲电池制造商的设备需求上升将是2011年全球行业收入的主要驱动力,预计将从2010年的$ 10.7B增长到$ 11.7B。受1级中国c-Si生产商的垂直整合愿望以及对现有和最新的Solar-buzz *光伏设备季度报告显示,在新兴的薄膜技术方面,410季度的在线制造能力进一步增加了1.25吉瓦,使2010年的年化c-Si电池和薄膜面板产能增加到11.5吉瓦。

著录项

  • 来源
    《Circuitree》 |2011年第1期|p.9-10|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号