首页> 外文期刊>Buses >Trident tried and tested with trained train team
【24h】

Trident tried and tested with trained train team

机译:Trident在训练有素的培训团队中进行了尝试和测试

获取原文
获取原文并翻译 | 示例
       

摘要

I sampled the rail replacement operation during the first week of operation. The day got off to a poor start when the train from Peterborough to East Midlands Parkway was cancelled by a train failure. With no alternative options available, it was an hour's wait for the next service. On arrival at East Midlands Parkway, my first visit to the station (opened 2009), there was an abundance of signs directing passengers for Nottingham, and other rail destinations, to the station frontage. Rail replacement vehicles were waiting and I along with other passengers was able to get straight on to the buses. There were numerous staff on hand to assist passengers. A downside of the hot weather meant that conditions on the bus I joined, a Nottingham City Transport Dennis Trident with Plaxton President bodywork, were like a sauna. This was one of six former Go-Ahead London vehicles - new to First - acquired for this contract and refurbished to single-door layout.
机译:在操作的第一周,我对滑轨更换操作进行了采样。当一天从彼得伯勒到东米德兰兹大路的火车因火车故障而取消,开局糟糕。由于没有其他选择,等待下一个服务需要一个小时的时间。我第一次访问车站(2009年开业)到达东米德兰兹大路(East Midlands Parkway)时,有很多指示牌,将前往诺丁汉和其他铁路目的地的乘客引向车站的正面。铁路替换车辆正在等待,我和其他乘客得以直接上车。有许多工作人员在协助乘客。炎热的天气的不利影响意味着我所乘坐的公共汽车,即诺丁汉市运输丹尼斯·三叉戟与普拉克斯顿总统的车身上的状况就像桑拿一样。这是First购得的6辆伦敦原先Go-Ahead车辆之一,已为此合同购得并翻新为单门布局。

著录项

  • 来源
    《Buses》 |2013年第704期|55-55|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:51:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号