首页> 外文期刊>Buses >Reading simplifies Greenwave routes and quits Henley
【24h】

Reading simplifies Greenwave routes and quits Henley

机译:阅读简化了GreenWave路线和退出Henley

获取原文
获取原文并翻译 | 示例
       

摘要

In one of the few major permanent alterations made since the outbreak of the Covid pandemic, Reading Buses revised its network of Greenwave routes that serve employment and park-&-ride sites in the south of the town. The complex network used seven basic route numbers, supplemented by 14 more with suffixes. Worst afflicted was the 60, with variants 60A, 60B, 60C, 60E, 60M and 60X. The new network comprises just three variations, each now with its own brand identity. Buses to Kennet Island are now Ruby 10, Mereoak is served by park-&-ride 600, leaving Greenwave solely as route 50. This now follows just two routes, swapping over around 14.00, to follow the peak flows.
机译:在“Covid Pildemast爆发以来的少数几个重大的改变之一中,阅读公交车修订了其绿色航路网络,为镇南部的就业和公园 - 骑行地点提供了服务。复杂的网络使用了七个基本路线号码,额外的后缀补充了14个。折磨的最糟糕的是60,具有变体60a,60b,60c,60e,60m和60x。新网络仅包括三种变体,每个变体现在都有自己的品牌标识。公共汽车到Kennet Island的公共汽车现在是Ruby 10,Mereoak由Park&Ride 600服务,单独将GreenWave留在50号公路上。这现在只是两个路线,交换约14.00左右,沿着峰值流动。

著录项

  • 来源
    《Buses》 |2021年第790期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 23:02:20

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号