首页> 外文期刊>Buildings >Comparative Building Costs
【24h】

Comparative Building Costs

机译:比较建筑成本

获取原文
获取原文并翻译 | 示例
       

摘要

This healthcare system had outgrown its surgery department and needed a new unit. The replacement surgery and central sterile addition includes 18 operating rooms, 25 pre/post-op rooms, a 19-bay post-anesthesia unit, a central sterile/ decontamination unit, distribution warehouse, receiving area and three-bay loading dock. The expansion/renovation also called for a new hospital entry/lobby with a large canopy with a modern look that complements the original structure. Family rooms provide privacy for discussions between families and physicians.
机译:该医疗保健系统的外科部门已经无法容纳,需要一个新的部门。替代手术和中央无菌增建包括18个手术室,25个手术前/术后室,一个19托架麻醉后单元,一个中央无菌/去污单元,分配仓库,接收区和三托架装载台。扩建/翻新还需要新的医院入口/大堂,带有大顶篷,外观现代,可与原始结构相辅相成。家庭活动室为家庭和医生之间的讨论提供了隐私。

著录项

  • 来源
    《Buildings》 |2017年第4期|42-42|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:54:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号