LEAD TIMES

机译:交货时间

获取原文
获取原文并翻译 | 示例
       

摘要

Four sectors reduced lead times and Only three areas increased in the past quarter. At the end of 2003, piling suppliers ↑ were optimistic for 2004 and lead times increased by one week to six weeks overall. Suppliers were concerned about possible steel shortages affecting reinforcement prices and availability and this may affect the sector next quarter. The average lead time for concrete works → is unchanged at six weeks overall. Suppliers have again commented on the volatility of the reinforcement market, and above-inflation price rises are expected. Structural steelwork ↑ has increased to an average of 11 weeks, due to an increase in the manufacturing periods being quoted. All suppliers are busy and note that UK steel prices are increasing as China procures large volumes of raw material.
机译:四个部门缩短了交货时间,并且在上个季度仅增加了三个领域。到2003年底,打桩供应商↑对2004年表示乐观,交货时间总共增加了1周到6周。供应商担心钢铁短缺可能会影响钢筋价格和可用性,这可能会影响下一季度的行业。混凝土工程的平均交货时间→总体上保持六周不变。供应商再次对加固市场的动荡发表评论,预计通货膨胀率将超过价格。由于报价的生产周期增加,结构钢制品↑平均增加了11周。所有供应商都很忙,并注意到随着中国采购大量原材料,英国钢铁价格正在上涨。

著录项

  • 来源
    《Building》 |2004年第8325期|p.78|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:39:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号