首页> 外文期刊>Building >A CRITICAL PROCEDURE
【24h】

A CRITICAL PROCEDURE

机译:关键程序

获取原文
获取原文并翻译 | 示例
       

摘要

University College London Hospital is the latest PFI project to open its doors to the public, promising - as they all do - to get the best value from the private sector. So Building sent in an expert to assess just how well the fabric of this £422m building will withstand daily wear and tear over the 35-year PFI contract. Peter caplehorn is an architect with a no-nonsense approach to assessing how well products and materials stand up to use in completed PFI projects. Instead of relying on the maker's claims about its products and the data produced by whole-life cost models, he checks out building performance for himself. As the technical director of Scott Brownrigg, he spends his days trekking around factories and grilling those running them. He then visits completed projects to see how well its components have lasted. Only when he is satisfied that he understands how a product performs will he specify it on his own projects.
机译:伦敦大学学院医院医院是最新的PFI项目,向公众敞开大门,并且他们都承诺会从私营部门获得最大价值。因此,Building派了专家评估这栋耗资4.22亿英镑的建筑的结构在35年的PFI合同中如何承受日常磨损。彼得·卡普莱霍恩(Peter caplehorn)是一位建筑师,他采用一种严肃的方法来评估产品和材料在完成的PFI项目中的使用状况。他没有依靠制造商关于其产品和整个寿命成本模型产生的数据的主张,而是亲自检查了建筑性能。作为斯科特·布朗瑞格(Scott Brownrigg)的技术总监,他整天在工厂周围徒步旅行,并烧烤运行工厂的人。然后,他访问了已完成的项目,以查看其各个组成部分的持续时间。只有当他对了解产品的性能感到满意时,才会在自己的项目中指定产品。

著录项

  • 来源
    《Building》 |2005年第8399期|p.54-5759-61|共7页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:39:25

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号