In the current climate, ensuring there are sufficient funds to complete a project is a critical consideration for contractors. This is particularly the case with the increasing use of shell companies, which are often joint ventures that embark on developments funded by third parties. The only asset of the shell company is likely to be the land it is developing - although it may not even have this - and any profit it will make on the forward sale or letting of the development, once built out. The funder of such a development will be looking for security and protection in the event that the developer is not able to complete the project. The contractor will be looking for reassurance that it will be paid, and the use of advance payment bonds has been on the increase as "money in the bank" to cover one or maybe two valuations. At the other end of the scale are the parent company guarantees and performance bonds that are linked to claims for damages rather than the completion of a job. There is, however, another potentially more comprehensive solution: "step-in" rights.
机译:在当前的气候下,确保有足够的资金来完成一个项目对于承包商来说是至关重要的考虑因素。随着越来越多的空壳公司的使用尤其如此,空壳公司通常是合资企业,着手于第三方资助的开发。空壳公司的唯一资产可能是其正在开发的土地-尽管它甚至可能没有土地-并且一旦建成就可以从远期销售或出租中获得任何利润。如果开发者无法完成该项目,则此类开发的出资者将寻求安全性和保护。承包商将寻求保证将要支付的款项,并且预付款保证金的使用已越来越多地用作“银行存款”,以支付一到两个估价。规模的另一端是母公司的担保和履约保证金,与损失索赔而不是完成工作相关。但是,还有另一种可能更全面的解决方案:“进入”权限。

著录项

  • 来源
    《Building》 |2008年第31期|p.41|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:37:26

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号