A recent article in Building by Simon Rawlinson (21 November, page 68) claimed clients were increasingly returning to single-stage tendering. So, does this move make sense?rnThe trouble with single-stage tendering is that it does not generate reliable outturn costs. In fact, this method of procurement often produces a fragmented project team with the contractor appointed too late to influence the design, programme or risk management strategy, and braced to claim compensation to make up for errors in its estimates. The result is that there is more conflict between clients and contractors, with variations and claims working up the original tender price. Not a good recipe.rnSimon says single-stage tendering offers the discipline of completing designs before the contractor is appointed. This ignores evidence, from the Banwell Report in 1964 through to the National Audit Office in 2005, that contractors and subcontractors have more to offer than simply a price for building someone else's designs. Systems that obtain timely contractor input to buildability and affordability offer real discipline, and a proper two-stage process achieves this.
机译:西蒙·罗林森(Simon Rawlinson)在《建筑》杂志上发表的一篇最新文章(11月21日,第68页)声称,客户越来越多地选择单阶段招标。那么,此举是否有意义?单阶段招标的问题在于它不会产生可靠的外包成本。实际上,这种采购方法通常会导致支离破碎的项目团队,而承包商被任命为时太晚,以至于无法影响设计,程序或风险管理策略,并准备要求赔偿以弥补其估计中的错误。结果是,客户和承包商之间存在更多的冲突,变化和索赔导致原始投标价格上涨。西蒙说,单阶段招标提供了在任命承包商之前完成设计的准则。从1964年的《班威尔报告》到2005年的国家审计署,这都忽略了证据,即承包商和分包商提供的不仅仅是建筑别人设计的价格。能够及时获得承包商对可建造性和可负担性的投入的系统提供了真正的约束,而适当的两步过程就可以做到这一点。

著录项

  • 来源
    《Building》 |2008年第49期|47|共1页
  • 作者

    David Mosey;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:37:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号