首页> 外文期刊>Building >How Do You Build Nuclear Power Stations Again?
【24h】

How Do You Build Nuclear Power Stations Again?

机译:您如何再次建造核电站?

获取原文
获取原文并翻译 | 示例
       

摘要

Work on Europe's third generation of nuclear reactors is not going to plan. The first plant is being built in Olkiluoto in western Finland. It was meant to start operating next year, but the present estimate is that it will not be ready until 2012 at the earliest. It will also cost at least 50% more than was originally thought. Meanwhile, at Flamanville in Normandy the same European pressurised water reactor is being built for EDF, and this is going the same way. Recent reports claim that it is nine months behind schedule - which does not bode well for a project that has been on site for barely a year.rnFor the British nuclear new-build programme, this has grave implications. The European pressurised water reactor, designed by Areva NP, is one of two designs being considered for the UK, which means any technical problems it might have are a concern for Britain, too. Furthermore, most of the problems in Finland and France have been caused by civil engineering work, which would be the same for the UK's other option, Westinghouse's AP1000. In Finland and France, this is the reponsibility of Bouygues.
机译:欧洲第三代核反应堆的工作没有计划。第一家工厂正在芬兰西部的Olkiluoto建造。它原定于明年开始运行,但是目前的估计是最早要到2012年才能准备就绪。它的成本也将比最初预期的高出至少50%。同时,在诺曼底的弗拉曼维尔,同样的欧洲压水堆也正在为EDF建造,并且发展的方向相同。最近的报道称,这比原定计划晚了九个月,对于一个已在场不到一年的项目来说,这并不是一个好兆头。对于英国的核新建造计划,这具有严重的意义。由Areva NP设计的欧洲压水堆是英国正在考虑的两种设计之一,这意味着英国可能会遇到的任何技术问题。此外,芬兰和法国的大多数问题都是由土木工程引起的,这与英国的另一选择西屋电气的AP1000相同。在芬兰和法国,这是Bouygues的责任。

著录项

  • 来源
    《Building》 |2008年第49期|24-27|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:37:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号